November 1st - Thanksgiving
The construction has proceeded very quickly now that the framing crew has been turned lose. Lots
of photos!
6x6 Cypress supports for porch.
Floor Joists
Porch rafters.
Sub Floor.
The start of the exterior walls.
Guest Bedroom
Kitchen
Middle part of great room from loft.
Right Section of Great Room
Master Bedroom
Need a zip line to the pool!
View out side kitchen window looking North.
Front of house.
View from mezzanine
Some details
Through bolt (5/8 inch).
Through bolt (5/8 inch) still to be drilled and attached.
Blocking for decking.
Example of pattern for decking.
Comments
Post a Comment