November 1st - Thanksgiving

The construction has proceeded very quickly now that the framing crew has been turned lose. Lots 
 of photos!

6x6 Cypress supports for porch.







Floor Joists






  Porch rafters.

 








Sub Floor.





The start of the exterior walls.




 

 




Guest Bedroom

Kitchen


Middle part of great room from loft.


Right Section of Great Room


Master Bedroom

Need a zip line to the pool!


View out side kitchen window looking North.


Front of house.


View from mezzanine




Some details
 Through bolt (5/8 inch).

Through bolt (5/8 inch) still to be drilled and attached.


 Blocking for decking.
 

 Example of pattern for decking.

 

Comments