Foundation Part 3

Image
So now the concrete blocks need to be set and tied to the foundation with rebar then poured with concrete. Then the horizontal tie beam forms need to be made and those poured.   Now for the horizontal tie beams!   Lots of steel!

Foundation Part 2

Image
So on the 29th of September the concrete trucks showed up! And they kept coming!     This initial pour consisted of 110 cubic yards of concrete!

Foundation Part 1

Image
Well in September the foundation was started. The crew started the excavation and it actually started to look like a building site! It was amazing how much steel is going into the foundation.   And we are ready for the concrete!